c-power.be - 3. Windturbines









Search Preview

3. Windturbines

c-power.be
C-Power offshore windfarm on the Thorntonbank
.be > c-power.be

SEO audit: Content analysis

Language Error! No language localisation is found.
Title 3. Windturbines
Text / HTML ratio 31 %
Frame Excellent! The website does not use iFrame solutions.
Flash Excellent! The website does not have any flash contents.
Keywords cloud wind turbines Overview Project MW transformer speed CPower ms Environment station Windturbines Power General phase Effective voltage works generator
Keywords consistency
Keyword Content Title Description Headings
35
wind 10
turbines 7
Overview 7
Project 6
MW 6
Headings
H1 H2 H3 H4 H5 H6
1 6 0 0 0 0
Images We found 6 images on this web page.

SEO Keywords (Single)

Keyword Occurrence Density
35 1.75 %
wind 10 0.50 %
turbines 7 0.35 %
Overview 7 0.35 %
Project 6 0.30 %
MW 6 0.30 %
transformer 5 0.25 %
speed 5 0.25 %
CPower 5 0.25 %
ms 5 0.25 %
Environment 4 0.20 %
station 4 0.20 %
Windturbines 4 0.20 %
Power 4 0.20 %
General 4 0.20 %
phase 4 0.20 %
Effective 4 0.20 %
voltage 4 0.20 %
works 4 0.20 %
generator 4 0.20 %

SEO Keywords (Two Word)

Keyword Occurrence Density
of the 10 0.50 %
the wind 5 0.25 %
Effective works 4 0.20 %
Project phase 4 0.20 %
transformer station 4 0.20 %
Grid connection 3 0.15 %
615 MW 3 0.15 %
1 Foundations 3 0.15 %
2 Jackets 3 0.15 %
Injection at 3 0.15 %
3 Windturbines 3 0.15 %
to the 3 0.15 %
4 Cables 3 0.15 %
Cables between 3 0.15 %
between turbines 3 0.15 %
5 Offshore 3 0.15 %
9 Grid 3 0.15 %
Offshore transformer 3 0.15 %
— Overview 3 0.15 %
8 Injection 3 0.15 %

SEO Keywords (Three Word)

Keyword Occurrence Density Possible Spam
5 Offshore transformer 3 0.15 % No
9 Grid connection 3 0.15 % No
4 Cables between 3 0.15 % No
Cables between turbines 3 0.15 % No
Offshore transformer station 3 0.15 % No
6 Export cable 3 0.15 % No
7 Cable landing 3 0.15 % No
Cable landing onshore 3 0.15 % No
8 Injection at 3 0.15 % No
Injection at Slijkens 3 0.15 % No
the wind turbines 3 0.15 % No
— Overview — 3 0.15 % No
Project phase 23 2 0.10 % No
Foundations 2 Jackets 2 0.10 % No
1 Foundations 2 2 0.10 % No
Overview 1 Foundations 2 0.10 % No
Employment Ph23 Media 2 0.10 % No
of the wind 2 0.10 % No
Power Purchase Agreement 2 0.10 % No
of the nacelle 2 0.10 % No

SEO Keywords (Four Word)

Keyword Occurrence Density Possible Spam
5 Offshore transformer station 3 0.15 % No
4 Cables between turbines 3 0.15 % No
7 Cable landing onshore 3 0.15 % No
8 Injection at Slijkens 3 0.15 % No
9 Grid connection Environment 2 0.10 % No
Environment Project phase 1 2 0.10 % No
Cable landing onshore 8 2 0.10 % No
— Effective works — 2 0.10 % No
Effective works — Employment 2 0.10 % No
Employment Ph1 Project phase 2 0.10 % No
Ph1 Project phase 23 2 0.10 % No
Slijkens 9 Grid connection 2 0.10 % No
at Slijkens 9 Grid 2 0.10 % No
Injection at Slijkens 9 2 0.10 % No
onshore 8 Injection at 2 0.10 % No
2 Jackets 3 Windturbines 2 0.10 % No
Overview 1 Foundations 2 2 0.10 % No
Foundations 2 Jackets 3 2 0.10 % No
landing onshore 8 Injection 2 0.10 % No
Jackets 3 Windturbines 4 2 0.10 % No

Internal links in - c-power.be

General info
About us
Concession
Concession
Windfarm layout & specifications
Windfarm layout & specifications
Main partners
Main partners
Planning
Planning
Project details
Project details
Support by the EU
Support by the EU
Job opportunities
Job opportunities
Technology
Overview
1. Foundations
1. Foundations
2. Jackets
2. Jackets
3. Windturbines
3. Windturbines
4. Cables between turbines
4. Cables between turbines
5. Offshore transformer station
5. Offshore transformer station
6. Export cable
6. Export cable
7. Cable landing onshore
7. Cable landing onshore
8. Injection at Slijkens
8. Injection at Slijkens
9. Grid connection
9. Grid connection
Environment
Environment
Project phase 1
Overview
Effective works
Effective works
Employment Ph1
Employment Ph1
Project phase 2-3
Overview
Investment
Investment
Financing structure
Financing structure
Power Purchase Agreement
Power Purchase Agreement
Insurance
Insurance
Effective works
Effective works
Employment Ph2-3
Employment Ph2-3
Media
Photos C-Power
Movies C-Power
Movies C-Power
Press releases
Press releases
Links
Links
News
C-Power news archive
Contact
Contact
Zeezoogdieren in windpark gespot
Zeezoogdieren in windpark gespot
Aan de slag in de offshore windindustrie
Aan de slag in de offshore windindustrie

C-power.be Spined HTML


3. Windturbines Menu General info— About us— Concession— Windfarm layout & specifications— Main partners— Planning— Project details— Support by the EU— Job opportunitiesTechnology— Overview— 1. Foundations— 2. Jackets— 3. Windturbines— 4. Cables between turbines— 5. Offshore transformer station— 6. Export cable— 7. Cable landing onshore— 8. Injection at Slijkens— 9. Grid connectionEnvironment— EnvironmentProject phase 1— Overview— Construction— Effective works— Employment Ph1Project phase 2-3— Overview— Investment— Financing structure— Power Purchase Agreement— Insurance— Effective works— Employment Ph2-3Media— Photos C-Power— Movies C-Power— Press releases— Links— NewsContact General info About usConcessionWindfarm layout & specificationsMain partnersPlanningProject detailsSupport by the EUJob opportunities Technology Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7. Cable landing onshore8. Injection at Slijkens9. Grid connection Environment Environment Project phase 1 OverviewConstructionEffective worksEmployment Ph1 Project phase 2-3 OverviewInvestmentFinancing structurePower Purchase AgreementInsuranceEffective worksEmployment Ph2-3 Media Photos C-PowerMovies C-PowerPress releasesLinksNews Contact WindturbinesTopicsper turbine According to calculations by C-Power, based on over 1.2 million historic wind measurements on the tailspin since 1986, the wind turbines will run for 8440 hours per year, stuff 96% of the time.The equivalent number of hours when the wind turbines are running at full power (equivalent full load hours) has been calculated to be approximately 3300hrs/year.Topicsof the wind sublet The wind sublet consists of 54 turbines with an installed topics of 325,2 MW:Phase 1:    6 x 5 MWPhase 2:    30 x 6,15 MWPhase 3:    18 x 6,15 MW 6M (PH2&3) 5M (PH1) Improvement between Senvion 5M and 6M: General optimization of the diamond and the functionalities of the turbine Higher voltage of 6,6 kV (instead of 950 V) in generator stator Water cooling of generator (air – water –air) New gear box (higher torque) Adaptation of transformer to the higher voltage and power and improved cooling Optimization of the nacelle lay-out permitting easier maintenance   General Functional Details Cut-in wind speed: 3,5 m/s Rated capacity: 6,15 MW on 14 m/s5,00 MW on 13 m/s Cut-out wind speed: 30 m/s averaged 10mins – 35 m/s peak Power control: Variable speed and Pitch tenancy Rotor diameterSwept rotor areaHub heigth 126 m12469 m²+- 94 m whilom sea level   Power lines   Energy transport in the wind turbines The aerodynamic gravity of the wind (proportional to (wind speed)³) drives the rotor which is unfluctuating to the main shaft. In the gearbox the (slow) speed of the main shaft is converted into a rotating motion of the upper speed shaft, driving the generator. The electrical power is generated by this asynchronous generator and is transformed to a voltage level of 33,000 volts (33 kV). This power is transferred via subsea cables and an offshore transformer station to the upper voltage grid on land.The electric components of the Senvion 5M turbine are located in the rear part of the nacelle. Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7. Cable landing onshore8. Injection at Slijkens9. Grid connectionDiamond© Tall Tales, creatief marketing agency Wevelgem.