c-power.be - 9. Grid connection









Search Preview

9. Grid connection

c-power.be
C-Power offshore windfarm on the Thorntonbank
.be > c-power.be

SEO audit: Content analysis

Language Error! No language localisation is found.
Title 9. Grid connection
Text / HTML ratio 27 %
Frame Excellent! The website does not use iFrame solutions.
Flash Excellent! The website does not have any flash contents.
Keywords cloud Overview connection Project Slijkens CPower Grid Environment phase Effective works Employment kV station onshore Export transformer Offshore cable turbines
Keywords consistency
Keyword Content Title Description Headings
35
Overview 7
connection 7
Project 6
Slijkens 5
CPower 5
Headings
H1 H2 H3 H4 H5 H6
1 1 0 0 0 0
Images We found 2 images on this web page.

SEO Keywords (Single)

Keyword Occurrence Density
35 1.75 %
Overview 7 0.35 %
connection 7 0.35 %
Project 6 0.30 %
Slijkens 5 0.25 %
CPower 5 0.25 %
Grid 4 0.20 %
Environment 4 0.20 %
phase 4 0.20 %
Effective 4 0.20 %
works 4 0.20 %
Employment 4 0.20 %
kV 4 0.20 %
station 3 0.15 %
onshore 3 0.15 %
Export 3 0.15 %
transformer 3 0.15 %
Offshore 3 0.15 %
cable 3 0.15 %
turbines 3 0.15 %

SEO Keywords (Two Word)

Keyword Occurrence Density
at Slijkens 4 0.20 %
Grid connection 4 0.20 %
Project phase 4 0.20 %
Effective works 4 0.20 %
Export cable 3 0.15 %
Cable landing 3 0.15 %
7 Cable 3 0.15 %
— Overview 3 0.15 %
Overview — 3 0.15 %
kV grid 3 0.15 %
1 Foundations 3 0.15 %
on the 3 0.15 %
landing onshore 3 0.15 %
2 Jackets 3 0.15 %
150 kV 3 0.15 %
3 Windturbines 3 0.15 %
transformer station 3 0.15 %
Offshore transformer 3 0.15 %
4 Cables 3 0.15 %
Cables between 3 0.15 %

SEO Keywords (Three Word)

Keyword Occurrence Density Possible Spam
— Overview — 3 0.15 % No
9 Grid connection 3 0.15 % No
4 Cables between 3 0.15 % No
Cables between turbines 3 0.15 % No
5 Offshore transformer 3 0.15 % No
Offshore transformer station 3 0.15 % No
6 Export cable 3 0.15 % No
7 Cable landing 3 0.15 % No
Cable landing onshore 3 0.15 % No
8 Injection at 3 0.15 % No
Injection at Slijkens 3 0.15 % No
Employment Ph23 Media 2 0.10 % No
at Slijkens 9 2 0.10 % No
Effective works Employment 2 0.10 % No
Environment Project phase 2 0.10 % No
Project phase 1 2 0.10 % No
Power Purchase Agreement 2 0.10 % No
Slijkens 9 Grid 2 0.10 % No
— Effective works 2 0.10 % No
Effective works — 2 0.10 % No

SEO Keywords (Four Word)

Keyword Occurrence Density Possible Spam
8 Injection at Slijkens 3 0.15 % No
7 Cable landing onshore 3 0.15 % No
4 Cables between turbines 3 0.15 % No
5 Offshore transformer station 3 0.15 % No
at Slijkens 9 Grid 2 0.10 % No
Support by the EU 2 0.10 % No
Slijkens 9 Grid connection 2 0.10 % No
— Effective works — 2 0.10 % No
Cables between turbines 5 2 0.10 % No
onshore 8 Injection at 2 0.10 % No
9 Grid connection Environment 2 0.10 % No
Ph1 Project phase 23 2 0.10 % No
Environment Project phase 1 2 0.10 % No
Employment Ph1 Project phase 2 0.10 % No
between turbines 5 Offshore 2 0.10 % No
the 150 kV grid 2 0.10 % No
Injection at Slijkens 9 2 0.10 % No
Effective works — Employment 2 0.10 % No
landing onshore 8 Injection 2 0.10 % No
Jackets 3 Windturbines 4 2 0.10 % No

Internal links in - c-power.be

General info
About us
Concession
Concession
Windfarm layout & specifications
Windfarm layout & specifications
Main partners
Main partners
Planning
Planning
Project details
Project details
Support by the EU
Support by the EU
Job opportunities
Job opportunities
Technology
Overview
1. Foundations
1. Foundations
2. Jackets
2. Jackets
3. Windturbines
3. Windturbines
4. Cables between turbines
4. Cables between turbines
5. Offshore transformer station
5. Offshore transformer station
6. Export cable
6. Export cable
7. Cable landing onshore
7. Cable landing onshore
8. Injection at Slijkens
8. Injection at Slijkens
9. Grid connection
9. Grid connection
Environment
Environment
Project phase 1
Overview
Effective works
Effective works
Employment Ph1
Employment Ph1
Project phase 2-3
Overview
Investment
Investment
Financing structure
Financing structure
Power Purchase Agreement
Power Purchase Agreement
Insurance
Insurance
Effective works
Effective works
Employment Ph2-3
Employment Ph2-3
Media
Photos C-Power
Movies C-Power
Movies C-Power
Press releases
Press releases
Links
Links
News
C-Power news archive
Contact
Contact
Zeezoogdieren in windpark gespot
Zeezoogdieren in windpark gespot
Aan de slag in de offshore windindustrie
Aan de slag in de offshore windindustrie

C-power.be Spined HTML


9. Grid connection Menu General info— About us— Concession— Windfarm layout & specifications— Main partners— Planning— Project details— Support by the EU— Job opportunitiesTechnology— Overview— 1. Foundations— 2. Jackets— 3. Windturbines— 4. Cables between turbines— 5. Offshore transformer station— 6. Export cable— 7. Cable landing onshore— 8. Injection at Slijkens— 9. Grid connectionEnvironment— EnvironmentProject phase 1— Overview— Construction— Effective works— Employment Ph1Project phase 2-3— Overview— Investment— Financing structure— Power Purchase Agreement— Insurance— Effective works— Employment Ph2-3Media— Photos C-Power— Movies C-Power— Press releases— Links— NewsContact General info About usConcessionWindfarm layout & specificationsMain partnersPlanningProject detailsSupport by the EUJob opportunities Technology Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7. Cable landing onshore8. Injection at Slijkens9. Grid connection Environment Environment Project phase 1 OverviewConstructionEffective worksEmployment Ph1 Project phase 2-3 OverviewInvestmentFinancing structurePower Purchase AgreementInsuranceEffective worksEmployment Ph2-3 Media Photos C-PowerMovies C-PowerPress releasesLinksNews Contact Grid connection C-Power has a connection power of 346,52 MVA on the 150 kV grid of Elia, the Belgian Transmission System Operator. The produced power of the wind sublet in the North Sea is directly unfluctuating on the existing upper voltage substation Slijkens 150 kV. The temporary connection point for the 30 MW injection on the 36 kV grid at Slijkens will disappear without connection to the 150 kV grid.     Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7. Cable landing onshore8. Injection at Slijkens9. Grid connection Design © Tall Tales, creatief marketing agency Wevelgem.