Search Preview
1. Foundations
c-power.beC-Power offshore windfarm on the Thorntonbank
.be > c-power.be
SEO audit: Content analysis
Language | Error! No language localisation is found. | ||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Title | 1. Foundations | ||||||||||||||||||||||||||||||||||||
Text / HTML ratio | 31 % | ||||||||||||||||||||||||||||||||||||
Frame | Excellent! The website does not use iFrame solutions. | ||||||||||||||||||||||||||||||||||||
Flash | Excellent! The website does not have any flash contents. | ||||||||||||||||||||||||||||||||||||
Keywords cloud | — works Overview foundation phase turbines Foundations Project structure Effective Environment Employment Jackets CPower installation jacket GBF production connection Grid | ||||||||||||||||||||||||||||||||||||
Keywords consistency |
|
||||||||||||||||||||||||||||||||||||
Headings |
|
||||||||||||||||||||||||||||||||||||
Images | We found 5 images on this web page. |
SEO Keywords (Single)
Keyword | Occurrence | Density |
---|---|---|
— | 35 | 1.75 % |
works | 7 | 0.35 % |
Overview | 7 | 0.35 % |
foundation | 6 | 0.30 % |
phase | 6 | 0.30 % |
turbines | 6 | 0.30 % |
Foundations | 6 | 0.30 % |
Project | 6 | 0.30 % |
structure | 5 | 0.25 % |
Effective | 4 | 0.20 % |
Environment | 4 | 0.20 % |
Employment | 4 | 0.20 % |
Jackets | 4 | 0.20 % |
CPower | 4 | 0.20 % |
installation | 4 | 0.20 % |
jacket | 4 | 0.20 % |
GBF | 3 | 0.15 % |
production | 3 | 0.15 % |
connection | 3 | 0.15 % |
Grid | 3 | 0.15 % |
SEO Keywords (Two Word)
Keyword | Occurrence | Density |
---|---|---|
Effective works | 4 | 0.20 % |
Project phase | 4 | 0.20 % |
at Slijkens | 3 | 0.15 % |
Offshore transformer | 3 | 0.15 % |
9 Grid | 3 | 0.15 % |
2 Jackets | 3 | 0.15 % |
3 Windturbines | 3 | 0.15 % |
4 Cables | 3 | 0.15 % |
Cables between | 3 | 0.15 % |
between turbines | 3 | 0.15 % |
for the | 3 | 0.15 % |
5 Offshore | 3 | 0.15 % |
transformer station | 3 | 0.15 % |
Injection at | 3 | 0.15 % |
— Overview | 3 | 0.15 % |
6 Export | 3 | 0.15 % |
Export cable | 3 | 0.15 % |
the jacket | 3 | 0.15 % |
7 Cable | 3 | 0.15 % |
Cable landing | 3 | 0.15 % |
SEO Keywords (Three Word)
Keyword | Occurrence | Density | Possible Spam |
---|---|---|---|
Injection at Slijkens | 3 | 0.15 % | No |
9 Grid connection | 3 | 0.15 % | No |
4 Cables between | 3 | 0.15 % | No |
Cables between turbines | 3 | 0.15 % | No |
— Overview — | 3 | 0.15 % | No |
Offshore transformer station | 3 | 0.15 % | No |
6 Export cable | 3 | 0.15 % | No |
5 Offshore transformer | 3 | 0.15 % | No |
7 Cable landing | 3 | 0.15 % | No |
8 Injection at | 3 | 0.15 % | No |
Cable landing onshore | 3 | 0.15 % | No |
Employment Ph1 Project | 2 | 0.10 % | No |
works — Employment | 2 | 0.10 % | No |
Effective works — | 2 | 0.10 % | No |
— Effective works | 2 | 0.10 % | No |
are built on | 2 | 0.10 % | No |
installation of the | 2 | 0.10 % | No |
to weather risks | 2 | 0.10 % | No |
Grid connection Environment | 2 | 0.10 % | No |
Employment Ph23 Media | 2 | 0.10 % | No |
SEO Keywords (Four Word)
Keyword | Occurrence | Density | Possible Spam |
---|---|---|---|
7 Cable landing onshore | 3 | 0.15 % | No |
5 Offshore transformer station | 3 | 0.15 % | No |
8 Injection at Slijkens | 3 | 0.15 % | No |
4 Cables between turbines | 3 | 0.15 % | No |
Injection at Slijkens 9 | 2 | 0.10 % | No |
Support by the EU | 2 | 0.10 % | No |
at Slijkens 9 Grid | 2 | 0.10 % | No |
Slijkens 9 Grid connection | 2 | 0.10 % | No |
subject to weather risks | 2 | 0.10 % | No |
Overview 1 Foundations 2 | 2 | 0.10 % | No |
landing onshore 8 Injection | 2 | 0.10 % | No |
Ph1 Project phase 23 | 2 | 0.10 % | No |
Employment Ph1 Project phase | 2 | 0.10 % | No |
Effective works — Employment | 2 | 0.10 % | No |
— Effective works — | 2 | 0.10 % | No |
9 Grid connection Environment | 2 | 0.10 % | No |
onshore 8 Injection at | 2 | 0.10 % | No |
Environment Project phase 1 | 2 | 0.10 % | No |
Cable landing onshore 8 | 2 | 0.10 % | No |
Offshore transformer station 6 | 2 | 0.10 % | No |
Internal links in - c-power.be
About us
Concession
Windfarm layout & specifications
Main partners
Planning
Project details
Support by the EU
Job opportunities
Overview
1. Foundations
2. Jackets
3. Windturbines
4. Cables between turbines
5. Offshore transformer station
6. Export cable
7. Cable landing onshore
8. Injection at Slijkens
9. Grid connection
Environment
Overview
Effective works
Employment Ph1
Overview
Investment
Financing structure
Power Purchase Agreement
Insurance
Effective works
Employment Ph2-3
Photos C-Power
Movies C-Power
Press releases
Links
C-Power news archive
Contact
Zeezoogdieren in windpark gespot
Aan de slag in de offshore windindustrie
C-power.be Spined HTML
1. Foundations Menu General info— About us— Concession— Windfarm layout & specifications— Main partners— Planning— Project details— Support by the EU— Job opportunitiesTechnology— Overview— 1. Foundations— 2. Jackets— 3. Windturbines— 4. Cables between turbines— 5. Offshore transformer station— 6. Export cable— 7. Cable landing onshore— 8. Injection at Slijkens— 9. Grid connectionEnvironment— EnvironmentProject phase 1— Overview— Construction— Effective works— Employment Ph1Project phase 2-3— Overview— Investment— Financing structure— Power Purchase Agreement— Insurance— Effective works— Employment Ph2-3Media— Photos C-Power— Movies C-Power— Press releases— Links— NewsContact General info About usConcessionWindfarm layout & specificationsMain partnersPlanningProject detailsSupport by the EUJob opportunities Technology Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7. Cable landing onshore8. Injection at Slijkens9. Grid connection Environment Environment Project phase 1 OverviewConstructionEffective worksEmployment Ph1 Project phase 2-3 OverviewInvestmentFinancing structurePower Purchase AgreementInsuranceEffective worksEmployment Ph2-3 Media Photos C-PowerMovies C-PowerPress releasesLinksNews Contact Foundations The first phase wind turbines are built on gravity-based foundations while phase 2 and 3 are built on Jacket foundations. Jacket Foundations (Phase 2&3) Gravity Based Foundations (Phase 1) The jacket foundation is a steel structure with four legs unfluctuating to each other with braces. The legs are grouted to pinpiles. The latter are driven into the sea soil. The main advantages for the jacket foundation in comparison with the gravity based foundation is serial production and easier logistics. The gravity based foundation (GBF) is a touchable cylindrical/conical structure. It is a support structure held in place by its own gravity. The deepest locations realized with GBF foundations are the ones at the Thorntonbank. Faster fabrication (serial production) Better quality tenancy (7/7 days – 24h/days) Simpler logistic Less harbour space needed Less marine preparation works For the Jacket installation, only 2 types of installation vessels are required. One for the pre-pilling with small dimension piles and readily misogynist pile driving hammers and flipside one for the installation of the jacket foundation (delivered to the site directly from the jacket production line) More cost-effective (steel price evolution!) Easier decommissioning Need for remoter standardization and industrialization Man power-intensive works Logistically ramified More harbour space needed Many marine preparation works (seabed preparation, scour protection, …) subject to weather risks The installation of the GBF requires the intervention of numerous large vessels, subject to weather risks Jackets are standard equipment in the Oil & Gas offshore industry and are state-of-the-art technology for North Sea conditions. They are increasingly seen as one of the standard foundation designs for offshore turbines in mid-depth waters (25-50 meters) and have been utilized recently for a number of projects, including Beatrice and Alpha Ventus with Senvion turbines. Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7. Cable landing onshore8. Injection at Slijkens9. Grid connection Design © Tall Tales, creatief marketing agency Wevelgem.