c-power.be - Project phase 2-3









Search Preview

Overview

c-power.be
C-Power offshore windfarm on the Thorntonbank
.be > c-power.be

SEO audit: Content analysis

Language Error! No language localisation is found.
Title Overview
Text / HTML ratio 30 %
Frame Excellent! The website does not use iFrame solutions.
Flash Excellent! The website does not have any flash contents.
Keywords cloud Overview works phase turbines Project installation CPower Effective Employment Offshore Environment Financing Investment Power cable Purchase Agreement Insurance Construction
Keywords consistency
Keyword Content Title Description Headings
35
Overview 8
works 7
phase 7
turbines 7
Project 6
Headings
H1 H2 H3 H4 H5 H6
1 2 0 0 0 0
Images We found 2 images on this web page.

SEO Keywords (Single)

Keyword Occurrence Density
35 1.75 %
Overview 8 0.40 %
works 7 0.35 %
phase 7 0.35 %
turbines 7 0.35 %
Project 6 0.30 %
installation 5 0.25 %
CPower 5 0.25 %
Effective 5 0.25 %
Employment 5 0.25 %
Offshore 4 0.20 %
Environment 4 0.20 %
Financing 3 0.15 %
Investment 3 0.15 %
Power 3 0.15 %
cable 3 0.15 %
Purchase 3 0.15 %
Agreement 3 0.15 %
Insurance 3 0.15 %
Construction 3 0.15 %

SEO Keywords (Two Word)

Keyword Occurrence Density
of the 8 0.40 %
installation of 5 0.25 %
Effective works 5 0.25 %
Project phase 4 0.20 %
Employment Ph23 3 0.15 %
by the 3 0.15 %
— Overview 3 0.15 %
Overview — 3 0.15 %
Financing structure 3 0.15 %
works Employment 3 0.15 %
Power Purchase 3 0.15 %
Purchase Agreement 3 0.15 %
Cable landing 2 0.10 %
7 Cable 2 0.10 %
Insurance Effective 2 0.10 %
Export cable 2 0.10 %
6 Export 2 0.10 %
Ph23 Media 2 0.10 %
Agreement Insurance 2 0.10 %
transformer station 2 0.10 %

SEO Keywords (Three Word)

Keyword Occurrence Density Possible Spam
installation of the 5 0.25 % No
— Overview — 3 0.15 % No
Power Purchase Agreement 3 0.15 % No
Effective works Employment 3 0.15 % No
5 Offshore transformer 2 0.10 % No
Environment Project phase 2 0.10 % No
Insurance Effective works 2 0.10 % No
Agreement Insurance Effective 2 0.10 % No
Purchase Agreement Insurance 2 0.10 % No
structure Power Purchase 2 0.10 % No
Financing structure Power 2 0.10 % No
Investment Financing structure 2 0.10 % No
4 Cables between 2 0.10 % No
Cables between turbines 2 0.10 % No
Overview Investment Financing 2 0.10 % No
7 Cable landing 2 0.10 % No
and installation of 2 0.10 % No
Project phase 23 2 0.10 % No
Ph1 Project phase 2 0.10 % No
6 Export cable 2 0.10 % No

SEO Keywords (Four Word)

Keyword Occurrence Density Possible Spam
Effective works — Employment 2 0.10 % No
Effective works Employment Ph23 2 0.10 % No
and installation of the 2 0.10 % No
Employment Ph1 Project phase 2 0.10 % No
Ph1 Project phase 23 2 0.10 % No
8 Injection at Slijkens 2 0.10 % No
4 Cables between turbines 2 0.10 % No
Overview Investment Financing structure 2 0.10 % No
Investment Financing structure Power 2 0.10 % No
Financing structure Power Purchase 2 0.10 % No
structure Power Purchase Agreement 2 0.10 % No
Power Purchase Agreement Insurance 2 0.10 % No
Support by the EU 2 0.10 % No
Purchase Agreement Insurance Effective 2 0.10 % No
Agreement Insurance Effective works 2 0.10 % No
— Effective works — 2 0.10 % No
Insurance Effective works Employment 2 0.10 % No
9 Grid connection Environment 2 0.10 % No
the installation of the 2 0.10 % No
5 Offshore transformer station 2 0.10 % No

Internal links in - c-power.be

General info
About us
Concession
Concession
Windfarm layout & specifications
Windfarm layout & specifications
Main partners
Main partners
Planning
Planning
Project details
Project details
Support by the EU
Support by the EU
Job opportunities
Job opportunities
Technology
Overview
1. Foundations
1. Foundations
2. Jackets
2. Jackets
3. Windturbines
3. Windturbines
4. Cables between turbines
4. Cables between turbines
5. Offshore transformer station
5. Offshore transformer station
6. Export cable
6. Export cable
7. Cable landing onshore
7. Cable landing onshore
8. Injection at Slijkens
8. Injection at Slijkens
9. Grid connection
9. Grid connection
Environment
Environment
Project phase 1
Overview
Effective works
Effective works
Employment Ph1
Employment Ph1
Project phase 2-3
Overview
Investment
Investment
Financing structure
Financing structure
Power Purchase Agreement
Power Purchase Agreement
Insurance
Insurance
Effective works
Effective works
Employment Ph2-3
Employment Ph2-3
Media
Photos C-Power
Movies C-Power
Movies C-Power
Press releases
Press releases
Links
Links
News
C-Power news archive
Contact
Contact
Zeezoogdieren in windpark gespot
Zeezoogdieren in windpark gespot
Aan de slag in de offshore windindustrie
Aan de slag in de offshore windindustrie

C-power.be Spined HTML


Overview Menu General info— About us— Concession— Windfarm layout & specifications— Main partners— Planning— Project details— Support by the EU— Job opportunitiesTechnology— Overview— 1. Foundations— 2. Jackets— 3. Windturbines— 4. Cables between turbines— 5. Offshore transformer station— 6. Export cable— 7.Subscriptionlanding onshore— 8. Injection at Slijkens— 9. Grid connectionEnvironment— EnvironmentProject phase 1— Overview— Construction— Effective works— Employment Ph1Project phase 2-3— Overview— Investment— Financing structure— Power Purchase Agreement— Insurance— Effective works— Employment Ph2-3Media— Photos C-Power— Movies C-Power— Press releases— Links— NewsContact General info About usConcessionWindfarm layout & specificationsMain partnersPlanningProject detailsSupport by the EUJob opportunities Technology Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7.Subscriptionlanding onshore8. Injection at Slijkens9. Grid connection Environment Environment Project phase 1 OverviewConstructionEffective worksEmployment Ph1 Project phase 2-3 OverviewInvestmentFinancing structurePower Purchase AgreementInsuranceEffective worksEmployment Ph2-3 Media Photos C-PowerMovies C-PowerPress releasesLinksNews Contact Overview The 2nd and 3rd phase of the C-Power project are the industrial phases pursuit the 1st phase considered as a pilot phase. Phase 2 and 3 consist of 48 6M Senvion turbines (24 in each concession sub-area), the installation of the Offshore Transformer Station (OTS) and the installation of the 2nd 150 kV export cable. The wind turbines are built on jacket foundations and are unfluctuating together and to the OTS by 33 kV cables.  Construction was started on November 25th, 2010 and was finalized on September 2013. Supply and works execution The turbines were provided by Senvion who is responsible for the supply, Operation and Maintenance of the wind turbines during the first 10 years of exploitation (including a possible extension for 10 spare years).The installation of the turbines was executed by the THV Seawind consortium, which was moreover in tuition of the wastefulness of plant (onshore works, construction and installation of the foundations and installation of the cables). All cables and the Offshore Transformer Plateform (OTS) are designed and supplied by ABB. OverviewInvestmentFinancing structurePower Purchase AgreementInsuranceEffective worksEmployment Ph2-3 Design © Tall Tales, creatief marketing agency Wevelgem.