Search Preview
2. Jackets
c-power.beC-Power offshore windfarm on the Thorntonbank
.be > c-power.be
SEO audit: Content analysis
Language | Error! No language localisation is found. | ||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Title | 2. Jackets | ||||||||||||||||||||||||||||||||||||
Text / HTML ratio | 30 % | ||||||||||||||||||||||||||||||||||||
Frame | Excellent! The website does not use iFrame solutions. | ||||||||||||||||||||||||||||||||||||
Flash | Excellent! The website does not have any flash contents. | ||||||||||||||||||||||||||||||||||||
Keywords cloud | — jacket Overview Project main part pile midsection Belgium connection works Jackets transition Employment phase Environment CPower Effective steel | ||||||||||||||||||||||||||||||||||||
Keywords consistency |
|
||||||||||||||||||||||||||||||||||||
Headings |
|
||||||||||||||||||||||||||||||||||||
Images | We found 16 images on this web page. |
SEO Keywords (Single)
Keyword | Occurrence | Density |
---|---|---|
— | 35 | 1.75 % |
16 | 0.80 % | |
jacket | 13 | 0.65 % |
Overview | 7 | 0.35 % |
Project | 6 | 0.30 % |
main | 6 | 0.30 % |
part | 6 | 0.30 % |
pile | 6 | 0.30 % |
midsection | 6 | 0.30 % |
Belgium | 5 | 0.25 % |
connection | 5 | 0.25 % |
works | 4 | 0.20 % |
Jackets | 4 | 0.20 % |
transition | 4 | 0.20 % |
Employment | 4 | 0.20 % |
phase | 4 | 0.20 % |
Environment | 4 | 0.20 % |
CPower | 4 | 0.20 % |
Effective | 4 | 0.20 % |
steel | 4 | 0.20 % |
SEO Keywords (Two Word)
Keyword | Occurrence | Density |
---|---|---|
7 | 0.35 % | |
main jacket | 6 | 0.30 % |
of the | 6 | 0.30 % |
The | 5 | 0.25 % |
jacket part | 5 | 0.25 % |
Project phase | 4 | 0.20 % |
pile stoppers | 4 | 0.20 % |
The pile | 4 | 0.20 % |
and the | 4 | 0.20 % |
Effective works | 4 | 0.20 % |
the main | 4 | 0.20 % |
between turbines | 3 | 0.15 % |
1 Foundations | 3 | 0.15 % |
3 Windturbines | 3 | 0.15 % |
Overview — | 3 | 0.15 % |
— Overview | 3 | 0.15 % |
5 Offshore | 3 | 0.15 % |
Offshore transformer | 3 | 0.15 % |
transformer station | 3 | 0.15 % |
2 Jackets | 3 | 0.15 % |
SEO Keywords (Three Word)
Keyword | Occurrence | Density | Possible Spam |
---|---|---|---|
main jacket part | 5 | 0.25 % | No |
The pile stoppers | 4 | 0.20 % | No |
the main jacket | 4 | 0.20 % | No |
Offshore transformer station | 3 | 0.15 % | No |
Cable landing onshore | 3 | 0.15 % | No |
— Overview — | 3 | 0.15 % | No |
3 | 0.15 % | No | |
The | 3 | 0.15 % | No |
5 Offshore transformer | 3 | 0.15 % | No |
7 Cable landing | 3 | 0.15 % | No |
6 Export cable | 3 | 0.15 % | No |
4 Cables between | 3 | 0.15 % | No |
Cables between turbines | 3 | 0.15 % | No |
The main jacket | 2 | 0.10 % | No |
Employment Ph1 Project | 2 | 0.10 % | No |
Injection at Slijkens | 2 | 0.10 % | No |
9 Grid connection | 2 | 0.10 % | No |
Grid connection Environment | 2 | 0.10 % | No |
Environment Project phase | 2 | 0.10 % | No |
Project phase 1 | 2 | 0.10 % | No |
SEO Keywords (Four Word)
Keyword | Occurrence | Density | Possible Spam |
---|---|---|---|
4 Cables between turbines | 3 | 0.15 % | No |
the main jacket part | 3 | 0.15 % | No |
5 Offshore transformer station | 3 | 0.15 % | No |
7 Cable landing onshore | 3 | 0.15 % | No |
Foundations 2 Jackets 3 | 2 | 0.10 % | No |
main jacket part and | 2 | 0.10 % | No |
jacket part and the | 2 | 0.10 % | No |
8 Injection at Slijkens | 2 | 0.10 % | No |
9 Grid connection Environment | 2 | 0.10 % | No |
Environment Project phase 1 | 2 | 0.10 % | No |
Effective works — Employment | 2 | 0.10 % | No |
Employment Ph1 Project phase | 2 | 0.10 % | No |
Ph1 Project phase 23 | 2 | 0.10 % | No |
Overview 1 Foundations 2 | 2 | 0.10 % | No |
1 Foundations 2 Jackets | 2 | 0.10 % | No |
Windturbines 4 Cables between | 2 | 0.10 % | No |
The main jacket part | 2 | 0.10 % | No |
Jackets 3 Windturbines 4 | 2 | 0.10 % | No |
3 Windturbines 4 Cables | 2 | 0.10 % | No |
Cables between turbines 5 | 2 | 0.10 % | No |
Internal links in - c-power.be
About us
Concession
Windfarm layout & specifications
Main partners
Planning
Project details
Support by the EU
Job opportunities
Overview
1. Foundations
2. Jackets
3. Windturbines
4. Cables between turbines
5. Offshore transformer station
6. Export cable
7. Cable landing onshore
8. Injection at Slijkens
9. Grid connection
Environment
Overview
Effective works
Employment Ph1
Overview
Investment
Financing structure
Power Purchase Agreement
Insurance
Effective works
Employment Ph2-3
Photos C-Power
Movies C-Power
Press releases
Links
C-Power news archive
Contact
Zeezoogdieren in windpark gespot
Aan de slag in de offshore windindustrie
C-power.be Spined HTML
2. Jackets Menu General info— About us— Concession— Windfarm layout & specifications— Main partners— Planning— Project details— Support by the EU— Job opportunitiesTechnology— Overview— 1. Foundations— 2. Jackets— 3. Windturbines— 4. Cables between turbines— 5. Offshore transformer station— 6. Export cable— 7. Cable landing onshore— 8. Injection at Slijkens— 9. Grid connectionEnvironment— EnvironmentProject phase 1— Overview— Construction— Effective works— Employment Ph1Project phase 2-3— Overview— Investment— Financing structure— Power Purchase Agreement— Insurance— Effective works— Employment Ph2-3Media— Photos C-Power— Movies C-Power— Press releases— Links— NewsContact General info About usConcessionWindfarm layout & specificationsMain partnersPlanningProject detailsSupport by the EUJob opportunities Technology Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7. Cable landing onshore8. Injection at Slijkens9. Grid connection Environment Environment Project phase 1 OverviewConstructionEffective worksEmployment Ph1 Project phase 2-3 OverviewInvestmentFinancing structurePower Purchase AgreementInsuranceEffective worksEmployment Ph2-3 Media Photos C-PowerMovies C-PowerPress releasesLinksNews Contact Jackets The jacket foundations consist of a steel jacket with four legs and can be divided in several parts, which are stuff produced in variegated manufacturing yards throughout Europe. The final jacket turnout takes place in Hoboken (Belgium) at the yard of Smulders Foundations. The midsection: this is the transition piece between the main jacket part and the wind turbine tower section The main jacket part The pile stoppers: these form the transition between the main jacket and the pinpiles, four per jacket The secondary steel elements (such as anodes, wend landings, ladders ...) The main jacket part is made by Smulders (Hoboken, Belgium) in several stages. Jacket tubulars are supplied by subcontractor EEW, both in EEW Germany and EEW Korea. The pile stoppers indulge a grouted connection between each of the four legs of the main jacket part and the respective four pinpiles underneath. The pile stoppers are produced by Famaba (Poland) and Iemants (Arendonk, Belgium). The midsection is completely assembled, blasted and painted by Smulders' subcontractor Willems (Balen, Belgium). This midsection, moreover tabbed transition piece, forms the connection between the main jacket part and the windturbine. Each midsection contains 4 castings (transition between the ring stiffner and the 4 braces towards the midsection deck). These castings are stuff produced by Metalodlew (Krakow, Poland), partly by Allard (Turnhout, Belgium). The secondary steel items are made at several subcontractors such as Rheden (Netherlands) and Spomasz (Poland) for the j-tubes, tintinnabulate mouths, ladders, wend landings handrails and platforms. The pile stoppers, midsection and secondary steel items are delivered to Smulders for assembly to the main jacket part. In wing to whilom parts there are the pinpiles which are made at SIF (Roermond, Netherlands) and are not part of the assebly in Hoboken. The pinpiles are driven from a jack-up platform equipped with a special built installation frame, dimensions of the piling template are 18 m x 18 m (= footprint of the jacket), this template is stuff recovered without pile driving, to re-use it for the next location. This pile driving is washed-up surpassing installation of the jacket. Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7. Cable landing onshore8. Injection at Slijkens9. Grid connection Design © Tall Tales, creatief marketing agency Wevelgem.