Search Preview
7. Cable landing onshore
c-power.beC-Power offshore windfarm on the Thorntonbank
.be > c-power.be
SEO audit: Content analysis
Language | Error! No language localisation is found. | ||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Title | 7. Cable landing onshore | ||||||||||||||||||||||||||||||||||||
Text / HTML ratio | 27 % | ||||||||||||||||||||||||||||||||||||
Frame | Excellent! The website does not use iFrame solutions. | ||||||||||||||||||||||||||||||||||||
Flash | Excellent! The website does not have any flash contents. | ||||||||||||||||||||||||||||||||||||
Keywords cloud | — Overview Project cable Employment works Effective Environment CPower Cable landing onshore phase station transformer Windturbines Export Offshore turbines Cables | ||||||||||||||||||||||||||||||||||||
Keywords consistency |
|
||||||||||||||||||||||||||||||||||||
Headings |
|
||||||||||||||||||||||||||||||||||||
Images | We found 8 images on this web page. |
SEO Keywords (Single)
Keyword | Occurrence | Density |
---|---|---|
— | 35 | 1.75 % |
Overview | 7 | 0.35 % |
Project | 6 | 0.30 % |
cable | 5 | 0.25 % |
Employment | 4 | 0.20 % |
works | 4 | 0.20 % |
Effective | 4 | 0.20 % |
Environment | 4 | 0.20 % |
CPower | 4 | 0.20 % |
Cable | 4 | 0.20 % |
landing | 4 | 0.20 % |
onshore | 4 | 0.20 % |
phase | 4 | 0.20 % |
station | 3 | 0.15 % |
transformer | 3 | 0.15 % |
Windturbines | 3 | 0.15 % |
Export | 3 | 0.15 % |
Offshore | 3 | 0.15 % |
turbines | 3 | 0.15 % |
Cables | 3 | 0.15 % |
SEO Keywords (Two Word)
Keyword | Occurrence | Density |
---|---|---|
Cable landing | 4 | 0.20 % |
Project phase | 4 | 0.20 % |
landing onshore | 4 | 0.20 % |
Effective works | 4 | 0.20 % |
5 Offshore | 3 | 0.15 % |
Injection at | 3 | 0.15 % |
8 Injection | 3 | 0.15 % |
— Overview | 3 | 0.15 % |
Overview — | 3 | 0.15 % |
1 Foundations | 3 | 0.15 % |
9 Grid | 3 | 0.15 % |
7 Cable | 3 | 0.15 % |
2 Jackets | 3 | 0.15 % |
Export cable | 3 | 0.15 % |
6 Export | 3 | 0.15 % |
3 Windturbines | 3 | 0.15 % |
transformer station | 3 | 0.15 % |
Offshore transformer | 3 | 0.15 % |
4 Cables | 3 | 0.15 % |
at Slijkens | 3 | 0.15 % |
SEO Keywords (Three Word)
Keyword | Occurrence | Density | Possible Spam |
---|---|---|---|
Cable landing onshore | 4 | 0.20 % | No |
Cables between turbines | 3 | 0.15 % | No |
— Overview — | 3 | 0.15 % | No |
4 Cables between | 3 | 0.15 % | No |
Injection at Slijkens | 3 | 0.15 % | No |
8 Injection at | 3 | 0.15 % | No |
9 Grid connection | 3 | 0.15 % | No |
7 Cable landing | 3 | 0.15 % | No |
6 Export cable | 3 | 0.15 % | No |
Offshore transformer station | 3 | 0.15 % | No |
5 Offshore transformer | 3 | 0.15 % | No |
Grid connection Environment | 2 | 0.10 % | No |
Environment Project phase | 2 | 0.10 % | No |
Export cable 7 | 2 | 0.10 % | No |
— Effective works | 2 | 0.10 % | No |
Effective works — | 2 | 0.10 % | No |
works — Employment | 2 | 0.10 % | No |
Employment Ph1 Project | 2 | 0.10 % | No |
Ph1 Project phase | 2 | 0.10 % | No |
station 6 Export | 2 | 0.10 % | No |
SEO Keywords (Four Word)
Keyword | Occurrence | Density | Possible Spam |
---|---|---|---|
5 Offshore transformer station | 3 | 0.15 % | No |
4 Cables between turbines | 3 | 0.15 % | No |
7 Cable landing onshore | 3 | 0.15 % | No |
8 Injection at Slijkens | 3 | 0.15 % | No |
2 Jackets 3 Windturbines | 2 | 0.10 % | No |
onshore 8 Injection at | 2 | 0.10 % | No |
Ph1 Project phase 23 | 2 | 0.10 % | No |
9 Grid connection Environment | 2 | 0.10 % | No |
Employment Ph1 Project phase | 2 | 0.10 % | No |
Effective works — Employment | 2 | 0.10 % | No |
Environment Project phase 1 | 2 | 0.10 % | No |
— Effective works — | 2 | 0.10 % | No |
Slijkens 9 Grid connection | 2 | 0.10 % | No |
Support by the EU | 2 | 0.10 % | No |
at Slijkens 9 Grid | 2 | 0.10 % | No |
Injection at Slijkens 9 | 2 | 0.10 % | No |
Jackets 3 Windturbines 4 | 2 | 0.10 % | No |
landing onshore 8 Injection | 2 | 0.10 % | No |
turbines 5 Offshore transformer | 2 | 0.10 % | No |
1 Foundations 2 Jackets | 2 | 0.10 % | No |
Internal links in - c-power.be
About us
Concession
Windfarm layout & specifications
Main partners
Planning
Project details
Support by the EU
Job opportunities
Overview
1. Foundations
2. Jackets
3. Windturbines
4. Cables between turbines
5. Offshore transformer station
6. Export cable
7. Cable landing onshore
8. Injection at Slijkens
9. Grid connection
Environment
Overview
Effective works
Employment Ph1
Overview
Investment
Financing structure
Power Purchase Agreement
Insurance
Effective works
Employment Ph2-3
Photos C-Power
Movies C-Power
Press releases
Links
C-Power news archive
Contact
Zeezoogdieren in windpark gespot
Aan de slag in de offshore windindustrie
C-power.be Spined HTML
7.Subscriptionlanding onshore Menu General info— About us— Concession— Windfarm layout & specifications— Main partners— Planning— Project details— Support by the EU— Job opportunitiesTechnology— Overview— 1. Foundations— 2. Jackets— 3. Windturbines— 4. Cables between turbines— 5. Offshore transformer station— 6. Export cable— 7.Subscriptionlanding onshore— 8. Injection at Slijkens— 9. Grid connectionEnvironment— EnvironmentProject phase 1— Overview— Construction— Effective works— Employment Ph1Project phase 2-3— Overview— Investment— Financing structure— Power Purchase Agreement— Insurance— Effective works— Employment Ph2-3Media— Photos C-Power— Movies C-Power— Press releases— Links— NewsContact General info About usConcessionWindfarm layout & specificationsMain partnersPlanningProject detailsSupport by the EUJob opportunities Technology Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7.Subscriptionlanding onshore8. Injection at Slijkens9. Grid connection Environment Environment Project phase 1 OverviewConstructionEffective worksEmployment Ph1 Project phase 2-3 OverviewInvestmentFinancing structurePower Purchase AgreementInsuranceEffective worksEmployment Ph2-3 Media Photos C-PowerMovies C-PowerPress releasesLinksNews ContactSubscriptionlanding onshore The land fall of the high-voltage export subscription is situated on the beach. The subscription crosses the dunes by ways of horizontal directional drilling (HDD - 30 m unelevated the dune surface). At the land side of the dune crossing in Oostende, the 2 export cables are unfluctuating to 2 land cables (150 kV) which are unfluctuating to the Elia substation “Sas Slijkens”. Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7.Subscriptionlanding onshore8. Injection at Slijkens9. Grid connection Design © Tall Tales, creatief marketing agency Wevelgem.