c-power.be - Windfarm layout & specifications









Search Preview

Windfarm layout & specifications

c-power.be
C-Power offshore windfarm on the Thorntonbank
.be > c-power.be

SEO audit: Content analysis

Language Error! No language localisation is found.
Title Windfarm layout & specifications
Text / HTML ratio 11 %
Frame Excellent! The website does not use iFrame solutions.
Flash Excellent! The website does not have any flash contents.
Keywords cloud turbines Project area Overview station transformer Effective CPower MW Environment layout works wind Employment Windfarm phase consists Phase km²
Keywords consistency
Keyword Content Title Description Headings
35
turbines 8
Project 7
area 6
Overview 6
station 6
Headings
H1 H2 H3 H4 H5 H6
2 1 0 0 0 0
Images We found 4 images on this web page.

SEO Keywords (Single)

Keyword Occurrence Density
35 1.75 %
turbines 8 0.40 %
Project 7 0.35 %
area 6 0.30 %
Overview 6 0.30 %
station 6 0.30 %
transformer 5 0.25 %
Effective 4 0.20 %
CPower 4 0.20 %
MW 4 0.20 %
Environment 4 0.20 %
layout 4 0.20 %
works 4 0.20 %
wind 4 0.20 %
Employment 4 0.20 %
Windfarm 4 0.20 %
phase 4 0.20 %
consists 3 0.15 %
Phase 3 0.15 %
km² 3 0.15 %

SEO Keywords (Two Word)

Keyword Occurrence Density
transformer station 5 0.25 %
Project phase 4 0.20 %
Effective works 4 0.20 %
to the 4 0.20 %
Windfarm layout 4 0.20 %
Main partners 3 0.15 %
Support by 3 0.15 %
MW each 3 0.15 %
Project details 3 0.15 %
the concession 3 0.15 %
between turbines 3 0.15 %
Job opportunities 3 0.15 %
— Overview 3 0.15 %
consists of 3 0.15 %
the EU 3 0.15 %
layout specifications 3 0.15 %
Overview — 3 0.15 %
About us 3 0.15 %
of the 3 0.15 %
by the 3 0.15 %

SEO Keywords (Three Word)

Keyword Occurrence Density Possible Spam
Support by the 3 0.15 % No
by the EU 3 0.15 % No
Windfarm layout specifications 3 0.15 % No
— Overview — 3 0.15 % No
Grid connection Environment 2 0.10 % No
Effective works Employment 2 0.10 % No
the transformer station 2 0.10 % No
Employment Ph1 Project 2 0.10 % No
4 Cables between 2 0.10 % No
Cables between turbines 2 0.10 % No
5 Offshore transformer 2 0.10 % No
Offshore transformer station 2 0.10 % No
6 Export cable 2 0.10 % No
Employment Ph23 Media 2 0.10 % No
Cable landing onshore 2 0.10 % No
7 Cable landing 2 0.10 % No
8 Injection at 2 0.10 % No
Injection at Slijkens 2 0.10 % No
Power Purchase Agreement 2 0.10 % No
9 Grid connection 2 0.10 % No

SEO Keywords (Four Word)

Keyword Occurrence Density Possible Spam
Support by the EU 3 0.15 % No
About us Concession Windfarm 2 0.10 % No
by the EU Job 2 0.10 % No
Employment Ph1 Project phase 2 0.10 % No
to the transformer station 2 0.10 % No
5 Offshore transformer station 2 0.10 % No
Effective works — Employment 2 0.10 % No
— Effective works — 2 0.10 % No
9 Grid connection Environment 2 0.10 % No
7 Cable landing onshore 2 0.10 % No
Environment Project phase 1 2 0.10 % No
4 Cables between turbines 2 0.10 % No
the EU Job opportunities 2 0.10 % No
x 615 MW each 2 0.10 % No
8 Injection at Slijkens 2 0.10 % No
details Support by the 2 0.10 % No
the concession consists of 2 0.10 % No
us Concession Windfarm layout 2 0.10 % No
Concession Windfarm layout specifications 2 0.10 % No
Windfarm layout specifications Main 2 0.10 % No

Internal links in - c-power.be

General info
About us
Concession
Concession
Windfarm layout & specifications
Windfarm layout & specifications
Main partners
Main partners
Planning
Planning
Project details
Project details
Support by the EU
Support by the EU
Job opportunities
Job opportunities
Technology
Overview
1. Foundations
1. Foundations
2. Jackets
2. Jackets
3. Windturbines
3. Windturbines
4. Cables between turbines
4. Cables between turbines
5. Offshore transformer station
5. Offshore transformer station
6. Export cable
6. Export cable
7. Cable landing onshore
7. Cable landing onshore
8. Injection at Slijkens
8. Injection at Slijkens
9. Grid connection
9. Grid connection
Environment
Environment
Project phase 1
Overview
Effective works
Effective works
Employment Ph1
Employment Ph1
Project phase 2-3
Overview
Investment
Investment
Financing structure
Financing structure
Power Purchase Agreement
Power Purchase Agreement
Insurance
Insurance
Effective works
Effective works
Employment Ph2-3
Employment Ph2-3
Media
Photos C-Power
Movies C-Power
Movies C-Power
Press releases
Press releases
Links
Links
News
C-Power news archive
Contact
Contact
Zeezoogdieren in windpark gespot
Zeezoogdieren in windpark gespot
Aan de slag in de offshore windindustrie
Aan de slag in de offshore windindustrie

C-power.be Spined HTML


Windfarm layout & specifications Menu General info— About us— Concession— Windfarm layout & specifications— Main partners— Planning— Project details— Support by the EU— Job opportunitiesTechnology— Overview— 1. Foundations— 2. Jackets— 3. Windturbines— 4. Cables between turbines— 5. Offshore transformer station— 6. Export cable— 7. Cable landing onshore— 8. Injection at Slijkens— 9. Grid connectionEnvironment— EnvironmentProject phase 1— Overview— Construction— Effective works— Employment Ph1Project phase 2-3— Overview— Investment— Financing structure— Power Purchase Agreement— Insurance— Effective works— Employment Ph2-3Media— Photos C-Power— Movies C-Power— Press releases— Links— NewsContact General info About usConcessionWindfarm layout & specificationsMain partnersPlanningProject detailsSupport by the EUJob opportunities Technology Overview1. Foundations2. Jackets3. Windturbines4. Cables between turbines5. Offshore transformer station6. Export cable7. Cable landing onshore8. Injection at Slijkens9. Grid connection Environment Environment Project phase 1 OverviewConstructionEffective worksEmployment Ph1 Project phase 2-3 OverviewInvestmentFinancing structurePower Purchase AgreementInsuranceEffective worksEmployment Ph2-3 Media Photos C-PowerMovies C-PowerPress releasesLinksNews Contact Windfarm layout The wind sublet consists of 54 wind turbines,Within the concession area, two sub-areas are separated by a waterworks specified virtually the Interconnector gas self-mastery and the Concerto South 1 telecommunication cable: •    Sub zone A (southwestern part of the concession) consists of 30 turbines•    Sub zone B (northeastern part of the concession) consists of 24 turbines   The project was build in 3 phases:   Infield electrical cables to the transformer station connect the wind turbines in strings, and each string to the transformer station situated in the south-eastern corner of sub zone A.The transformer station transforms the topics from 33.000 volt to 150.000 volt.Two 150 kV high-voltage cables link the wind sublet zone to the upper voltage grid of Elia onshore in Bredene. Specifications Water depth 12 to 27,5 m Distance to the tailspin 27 to 30 kmZone19,84 km² (Area A=10,68 km² +ZoneB=9,16 km²) Distance between turbines 700 m Total topics 325,20 MWYearlygeneration 1.050.000.000 kWh or 1050 GWh= Enough energy for the yearly consumption of 300.000 families Avoided CO2 emission  415,000 tonnes/year (compared with a recent gas power station)= the yearly CO2 traction topics of a forested zone of 65,000 ha  = 1/3 of the forests within Flanders Wind turbines Phase 1: 6 x 5 MW eachPhase 2: 30 x 6,15 MW eachPhase 3: 18 x 6,15 MW each About usConcessionWindfarm layout & specificationsMain partnersPlanningProject detailsSupport by the EUJob opportunities Design © Tall Tales, creatief marketing agency Wevelgem.